| Main Technical Parameter: PE PP Film & Woven Bag / Rigid Plastic Washing Line |
| Capacity (kg/h) |
Total Power (kw) |
Area Required (m²) |
Labour Required |
Water Consumption (m³/h) |
| 300 | 130 | 240 | 2-3 workers | 0.5 |
| 500 | 200 | 360 | 2-3 workers | 0.7 |
| 1000 | 300 | 450 | 3-4 workers | 1 |
| 1500 | 420 | 520 | 3-4 workers | 1.5 |
| 2000 | 500 | 650 | 4-5 workers | 2 |
| Main Technical Parameter: PET Bottle Washing Line |
| Capacity (kg/h) |
Total Power (kw) |
Area Required (m²) |
Labour Required |
Steam (kg/h) |
Water (m³/h) |
| 300 | 150 | 350 | 4-6 | 260 | 0.5 |
| 1000 | 450 | 1000 | 8-10 | 480 | 2 |
| 3000 | 900 | 2400 | 12-14 | 1100 | 6 |
| Main Technical Parameter: PE PP Film & Woven Bag Pelletizing Line |
| Model |
Capacity (kg/h) |
Compactor Power (kw) |
1st Stage Motor (kw) |
2nd Stage Motor (kw) |
| SJ-100/100 | 250-350 | 55 | 90 | 30 |
| SJ-130/130 | 500-600 | 90 | 132 | 55 |
| SJ-180/200 | 900-1000 | 132 | 200 | 90 |
📜
Professional Certification
Providing efficient, convenient and safe cross-border trade one-stop import and export services. Support for various freight collection methods.
❓
Frequently Asked Questions
1. What materials can this recycling machine process?
The machine is specifically designed to process PE/PP films, woven bags, jumbo bags, and PET plastic bottles.
2. What is the production capacity of the washing and pelletizing lines?
We offer various models with capacities ranging from 300kg/h up to 3000kg/h to meet different industrial requirements.
3. What are the key certifications for this equipment?
Our recycling machines are fully certified with ISO9001:2008 and CE standards, ensuring international quality compliance.
4. What is the final size of the recycled plastic particles?
The pelletizing line produces high-quality plastic pellets with a final size of approximately 3-4mm.
5. How many operators are needed for a standard production line?
Depending on the automation level and capacity, a typical line requires between 2 to 14 workers per shift.
6. What are the installation requirements regarding space and power?
Required area ranges from 240m² to 2400m², with power requirements between 150kw and 500kw depending on the specific model selected.