Zhida Plastic Machinery Zhida Plastic Machinery

Jwell Plastic Recycling Machine Heat-Sensitive and Shear-Sensitive Materials with Sufficient Pre-Mixing Banbury Mixer

Customization: Available
After-sales Service: Provide
Warranty: 1 Year

Product Description

Basic Information
Model NO.
CJWV77 CJWH95
Raw Material
Various Types
Screw
Double-Screw
Automation
Automatic
Computerized
Computerized
Certification
CE, ISO9001:2008, Gsg
Motor Brand
Simens/Beide/Weg
Screw Brand
Jinhailuo
Capacity
2000-3500kg/H
Product Applications
High filling operation is to fill a high proportion of inorganic powder into resin carrier and ensure the filler distributed evenly. The resin carrier cannot be cut or broken in order to maintain good physical properties in the process of processing. Meanwhile, the equipment should guarantee higher capacity and low wear-off to keep cost-effective and highly practical.
Plastic Pelletizing Line
The high filler pelletizing line is widely used in pipes, wire series, extrusion, injection molding, films, strapping and so on.
Technical Specifications
Model L/D Speed Capacity for reference
CJWV77 36-56 400-900rpm 2000-3000kg/h
CJWH95 36-56 400-900rpm 3000-3500kg/h
Process Steps
Process Steps Diagram
About Our Production Base
Founded in 1997, the company is a vice president unit of the China Plastics Machinery Industry Association, specializing in plastic extrusion equipment and chemical fiber spinning complete sets of equipment. The production bases cover about 7,000,000 square meters across multiple specialized parts. With 26 professional companies and nine large-scale gold processing plants, the annual output exceeds 3000+ sets of high-grade plastic extrusion production lines, marketing in more than 120 countries and regions.
Production Facility 1 Production Facility 2 Production Facility 3
Our Advantages
Workshop Processing Quality Control Global Service
Packaging & Certifications
Packaging Certifications Exhibitions
Frequently Asked Questions
Q1. What about the payment way?
By TT, L/C at sight. 30% down payment should be paid after contract is valid, 70% balance should be paid before shipment.
Q2. Installation and stuff training available from you?
Yes, we have rich experience with engineers around the world who can be sent to your factory to train your workers. We also provide online guidance.
Q3. How long is the guarantee?
We offer high-quality machines with a 12-month guarantee and will reply to any inquiries within 6 hours.
Q4. How do you handle broken parts during the warranty period?
We will send you spare parts free of charge if they are within warranty (excluding easy-broken parts). For easy-broken parts, we only charge the cost fee.
Q5. How does your factory ensure quality control?
We have passed the ISO9001 Quality Management System and CE certification. A special QC department is in charge of the products' quality throughout the production process.
Q6. How can we check the machines before delivery?
We provide online checking during machine testing. Detailed testing videos and reports will be prepared before delivery. Third-party testing is also accepted.

Related Products